Majestic was appointed to redesign the network layout of Allstaff Airconditioning (Vic) Pty Ltd.

Headquartered in Melbourne, Allstaff Airconditioning has been a market leader in air conditioning and mechanical services for over 35 years. Since inception in May 1975, Allstaff has grown to a team of over 300 staff operating now in Victoria, New South Wales, Albury-Wodonga and the Australian Capital Territory.

Majestic evaluated, planned and implemented the successful network redesign by:-

  1. Network size – 150 users
  2. Redesign of the network layout
  3. Replacing the network cabling and ensuring provision for future VoIP implementation
  4. Relocating the server room
  5. Upgrading the server hardware (Dell based server, switches etc)
  6. Migrating the network from Windows Server 2003 and Exchange Server 2003 environment to Windows Server 2008 and Exchange Server 2007 64 bit environment
  7. Upgrading the Unix based IIS Application Server
  8. Migrating network applications and data to new servers
  9. Configuring internet connections and remote access
  10. Configuring VPN access to enterprise network application from other offices (Sydney, Albury- Wodonga and the ACT)

Share This Post

Share on facebook
Share on linkedin
Share on twitter
Share on email

More To Explore

Case Studies

Extract From PHH Annual Report 2019-2020

This extract from Peninsula Home Hospice Annual Report 2019-2020 has been reproduced with the permission of Rachel Bovenizer, CEO. A complete copy of this document